Practice set · code references to the NEC 2017

This NABCEP PV Installation Professional practice test holds 30 questions, and their split across the four PVIP job task analysis domains tracks the exam's weights. Several of them are calculations of the kind an installer runs before ordering wire and breakers, with every step of the arithmetic shown in the explanation. These are practice questions, not NABCEP questions, modeled on the installer job task analysis rather than on any NABCEP exam form or sample item.

  • 32% System design
  • 38% Installation
  • 17% Commissioning
  • 13% O&M

How the PVIP job task analysis (December 2017) splits the scored items. [JTA] [BE]

PVIP practice quiz: design, installation, commissioning, O&M

Score: 0 of 0 picked correctly · 30 items here

Q1 · System design · 32%

A residential string has 12 modules in series. Each module lists Voc = 41.6 V and a Voc temperature coefficient of −0.28 %/°C. The extreme minimum ambient is −16 °C. Using the module coefficient, as NEC 690.7(A) allows, what is the maximum string voltage?

One tap per item counts toward the score; opening the key first leaves the item unscored.

Skip ahead to the key and the reasoning

Worked answer: D

Temperature difference from STC −16 °C − 25 °C = −41 °C
Voc correction factor 1 + 0.0028 × 41 = 1.1148
Corrected module Voc 41.6 V × 1.1148 = 46.38 V
Maximum string voltage 46.38 V × 12 = 556.5 V

441.9 V applies the correction in the wrong direction; cold raises Voc, so the factor must be above 1.

499.2 V is 12 × 41.6 V at STC with no temperature correction, which understates the cold-morning voltage.

521.6 V measures the temperature change from 0 °C instead of from the 25 °C rating, so it undercorrects.

The temperature is 41 °C below the 25 °C rating, so each module gains 0.28% × 41 = 11.48%: 41.6 V × 1.1148 × 12 = 556.5 V.

Q2 · System design · 32%

A warehouse roof array uses an inverter with a 1,000 V maximum dc input. Modules list Voc = 49.8 V with a −0.27 %/°C coefficient, and the record low is −22 °C. Using the module coefficient, as NEC 690.7(A) allows, what is the most modules allowed per series string?

Skip ahead to the key and the reasoning

Worked answer: B

Temperature difference from STC −22 °C − 25 °C = −47 °C
Corrected module Voc 49.8 V × (1 + 0.0027 × 47) = 56.12 V
Modules that fit 1,000 V ÷ 56.12 V = 17.8
Most modules per string (round down) 17.8 → 17 = 17 modules

16 modules comes from multiplying Voc by 1.25, a current factor, or from the Table 690.7(A) factor that the stem rules out; the coefficient gives 1.1269.

Each module reaches 49.8 V × (1 + 0.0027 × 47) = 56.12 V at −22 °C; 1,000 ÷ 56.12 = 17.8, and a string must round down to 17.

18 modules rounds 17.8 up, putting the string at about 1,010 V on the coldest morning, above the inverter limit.

20 modules divides 1,000 V by the STC Voc of 49.8 V and ignores the cold-temperature rise.

Q3 · System design · 32%

Modules in a combiner have Isc = 11.2 A and a maximum series fuse rating of 25 A. What is the smallest standard source-circuit fuse that satisfies NEC 690.8 and 690.9?

Skip ahead to the key and the reasoning

Worked answer: B

Maximum circuit current, 690.8(A) 11.2 A × 1.25 = 14.0 A 690.8(A)
Minimum fuse rating, 690.9(B) 14.0 A × 1.25 = 17.5 A 690.9(B)
Smallest standard fuse 17.5 A → next standard size = 20 A

15 A stops after the first 125% (14.0 A) and misses the second 125% that 690.9(B) adds for the fuse.

690.8(A) gives 11.2 × 1.25 = 14.0 A; 690.9(B) sizes the fuse at 125% of that, 17.5 A, so the next standard rating is 20 A, within the 25 A module limit.

25 A is the module's maximum series fuse rating, the ceiling for the fuse, not the smallest rating that works.

30 A exceeds the module's 25 A maximum series fuse rating, so it would no longer protect the module.

Q4 · System design · 32%

A PV output circuit runs 150 ft (one way) in 10 AWG copper with a resistance of 1.24 Ω per 1,000 ft. It carries 10.0 A at maximum power, and the array's Vmp is 400 V (Voc 480 V). What is the voltage drop as a percentage of Vmp?

Skip ahead to the key and the reasoning

Worked answer: B

Round-trip length 2 × 150 ft = 300 ft
Voltage drop 300 ft × 10.0 A × 1.24 Ω ÷ 1,000 ft = 3.72 V
Drop as a share of Vmp 3.72 V ÷ 400 V × 100 = 0.93%

0.47% uses only the one-way length; current flows out and back, so the circuit length is 300 ft.

Round-trip drop is 2 × 150 ft × 10.0 A × 1.24 Ω ÷ 1,000 ft = 3.72 V, and 3.72 ÷ 400 = 0.93%.

1.16% runs the 125% code factor through the drop, using 12.5 A; voltage drop is figured at the operating current.

1.45% applies 156% to the current, a conductor-sizing margin that has no place in an operating voltage-drop figure.

Q5 · System design · 32%

Conductors from a rooftop array run in conduit along the roof to an exterior disconnect, passing 6 ft outside the array boundary. Under NEC 690.12 (2017), after rapid shutdown is initiated, these conductors must be limited to:

Skip ahead to the key and the reasoning

Outside the array boundary (1 ft from the array), 690.12(B)(1) in the 2017 NEC limits controlled conductors to 30 V within 30 seconds of initiation.

80 V within 30 seconds is one of the options inside the array boundary, not for conductors 6 ft away.

10 seconds was the 2014 edition's timing; the 2017 edition allows 30 seconds.

50 V is a shock-hazard threshold from electrical safety practice, and 10 seconds is outdated timing; neither is the 690.12 limit.

Q6 · System design · 32%

A crew lays out 14 identical modules in a single string: 8 face south and 6 face west. The inverter has one MPPT input. What is the main performance problem with this layout?

Skip ahead to the key and the reasoning

Orientation barely changes Voc, which is set by temperature and module count, so the voltage limit is at no extra risk.

Reverse current is a problem of strings in parallel; modules in one series string cannot feed one another.

Series modules share one current, so whichever face gets less sun holds the whole string back; bypass diodes then give up voltage instead.

One MPPT input finds one operating point for the whole string; separate orientations need separate inputs or module-level electronics.

Q7 · System design · 32%

An engineer's layout for a gable roof shows rail attachments every 48 in across the middle of the roof but every 24 in near the eaves, rakes, and ridge. What is the reason?

Skip ahead to the key and the reasoning

ASCE 7 assigns higher uplift pressures to the edge and corner zones of a roof, so attachment spans shrink there to keep each attachment within its rated load.

Rafter spacing is uniform across a framed roof; the layout changes because the load per attachment changes.

Fire-code pathways decide where modules may not go, not how densely the remaining rails are attached.

Thermal movement is handled with rail splices and gaps, not by adding attachments at the ends.

Q8 · System design · 32%

Module-to-module wiring will run exposed under a rooftop array without a raceway. Which conductor type does the 2017 NEC permit for this?

Skip ahead to the key and the reasoning

THWN-2 is wet-rated building wire but is not permitted as an exposed single conductor in the array; outdoors it goes in a raceway.

XHHW-2 is also a raceway conductor here; exposed single conductors in the array are limited to the types 690.31 names.

NM-B is limited to dry interior locations and is never permitted exposed on a roof.

690.31(C)(1) in the 2017 NEC permits single-conductor PV wire (and USE-2) exposed within the array because it is sunlight-resistant and wet-rated.

Q9 · System design · 32%

Per the 2017 NEC, the dc PV power source label at the PV system disconnect must show which values?

Skip ahead to the key and the reasoning

690.53 in the 2017 NEC lists maximum voltage and maximum circuit current, plus the charge controller or dc-to-dc converter output current where one is installed.

Maximum power-point voltage and current were on the 2014 label; the 2017 edition removed them and kept the maximum values.

Rated power and module count help a designer, but the label serves responders and electricians who need maximum electrical values.

Isc alone understates the 125% maximum circuit current, and the ac rating belongs on the inverter's own nameplate.

Q10 · System design · 32%

A rooftop string-inverter system has dc source circuits operating at 380 V. What dc protection does NEC 690.11 require for these circuits?

Skip ahead to the key and the reasoning

A GFCI protects people on ac branch circuits; it does not detect a series arc in the dc wiring.

An SPD clamps lightning and switching surges; it cannot sense or interrupt an arc.

690.11 requires listed PV-type arc-fault protection for PV system dc circuits at 80 V or more; most string inverters build it in.

Residual-current detection responds to leakage to ground, not to a series arc at a loose connector.

Q11 · Installation · 38%

A single-phase inverter is rated 7,680 W continuous ac output at 240 V. What is the smallest standard breaker for its output circuit?

Skip ahead to the key and the reasoning

Worked answer: C

Continuous output current 7,680 W ÷ 240 V = 32.0 A
Minimum breaker rating 32.0 A × 1.25 = 40.0 A
Smallest standard breaker 40.0 A is a standard size = 40 A

30 A rounds 32.0 A down to the standard size below it, leaving the breaker smaller than the continuous current.

35 A is the next standard size above 32.0 A, but the 125% continuous-current factor was skipped.

7,680 W ÷ 240 V = 32.0 A; the output breaker is sized at 125% of that continuous current, 40.0 A, which is itself a standard rating.

50 A applies the 125% factor twice (32.0 × 1.5625); the output breaker needs it once.

Q12 · Installation · 38%

A panel has a 225 A busbar and a 200 A main breaker, and a backfed PV breaker is placed as the 120% allowance of NEC 705.12 (2017) requires. What is the largest inverter rated output current allowed?

Skip ahead to the key and the reasoning

Worked answer: B

120% of busbar rating 225 A × 1.2 = 270 A
Room left for PV 270 A − 200 A = 70 A
Largest inverter output current 70 A ÷ 1.25 = 56.0 A

44.8 A divides the 70 A headroom by 1.25 twice; the 125% factor is counted once.

120% of 225 A is 270 A; less the 200 A main, 70 A remains, and the rule counts 125% of inverter current against it: 70 ÷ 1.25 = 56.0 A.

70.0 A is the headroom left on the busbar; the rule counts 125% of the inverter's output current against it, so the current itself must be lower.

87.5 A multiplies the headroom by 1.25 instead of dividing, which turns a limit into a larger number.

Q13 · Installation · 38%

Six current-carrying 10 AWG copper THWN-2 conductors share a conduit mounted 4 in above a roof, where the design high ambient is 38 °C. Starting from the 90 °C ampacity of 40 A, what is the corrected and adjusted ampacity under the 2017 NEC?

Skip ahead to the key and the reasoning

Worked answer: D

Temperature correction, 38 °C Table 310.15(B)(2)(a), 90 °C column = 0.91
Adjustment, 6 conductors Table 310.15(B)(3)(a) = 0.80
Corrected and adjusted ampacity 40 A × 0.91 × 0.80 = 29.1 A

16.0 A adds the 33 °C rooftop adder, which the 2017 NEC applies only when the raceway is less than 7/8 in above the roof.

20.0 A adds the rooftop adder, which does not apply here, and then also skips the 80% adjustment.

25.5 A uses 70%, the factor for 7–9 conductors, though six falls in the 4–6 bracket.

At 4 in above the roof there is no adder, so 40 A × 0.91 (36–40 °C, 90 °C column) × 0.80 (4–6 conductors) = 29.1 A.

Q14 · Installation · 38%

PV dc output conductors will run through a home's attic from the roof penetration to an inverter in the garage. Which wiring method does the 2017 NEC accept for this run?

Skip ahead to the key and the reasoning

PVC is a nonmetallic raceway, so it falls short of the metal wiring-method requirement for dc circuits inside a building.

ENT is nonmetallic and fails the same requirement for dc PV circuits indoors.

690.31(G) in the 2017 NEC requires dc PV circuits inside a building to be in metal raceway, metal-clad cable, or metal enclosures up to the first readily accessible disconnect; EMT is a metal raceway.

UF is a nonmetallic cable; inside a building the dc PV circuit needs metal raceway, Type MC cable, or a metal enclosure.

Q15 · Installation · 38%

A crew trenches Schedule 40 PVC conduit across a lawn with no vehicle traffic to feed a ground-mounted array's 480 V ac circuit. What minimum cover does NEC Table 300.5 require?

Skip ahead to the key and the reasoning

6 in is the cover for rigid or intermediate metal conduit, not PVC.

12 in applies to residential 120 V branch circuits of 20 A or less with GFCI protection, not a 480 V circuit.

Table 300.5 lists 18 in of cover for nonmetallic raceway in general locations not subject to vehicle traffic.

24 in is the cover for direct-buried cable installed without a raceway.

Q16 · Installation · 38%

A 480Y/277 V three-phase inverter and its ac disconnect hang on a wall. Directly opposite, 40 in away, is a concrete block wall. Per NEC Table 110.26(A)(1), what minimum working-space depth applies?

Skip ahead to the key and the reasoning

36 in is Condition 1, which needs nothing grounded on the far side; a concrete wall counts as grounded.

At 277 V to ground the 151–600 V row applies, and a concrete wall opposite makes it Condition 2: 3½ ft (42 in), so the 40 in clearance falls short.

48 in is Condition 3, for exposed live parts on both sides of the space.

78 in (6½ ft) is the minimum headroom of the working space, not its depth.

Q17 · Installation · 38%

An EMT run already has three 90° bends and two 45° bends between pull points. The layout now needs one more 90° bend. What does the NEC require?

Skip ahead to the key and the reasoning

Lubricant eases the pull but does not change the 360° limit between pull points.

A larger conduit does not raise the bend limit; it applies to every trade size.

A sweep still counts as 90° toward the total; the radius does not change the count.

Three 90s plus two 45s already total 360°, the NEC limit between pull points for EMT (358.26); another bend needs a pull point such as a box or conduit body.

Q18 · Installation · 38%

A 90 ft run of PVC conduit is mounted on a sunny commercial rooftop. What does NEC 352.44 call for?

Skip ahead to the key and the reasoning

352.44 requires expansion fittings where the expected length change between secured points is 1/4 in (6 mm) or more, which a sunny 90 ft rooftop run easily reaches.

Run length alone is not the trigger; a shorter run with a large temperature swing can still pass the 1/4 in threshold.

PVC is strapped loosely enough to slide; locking it in place makes it bow or pull out of fittings as it expands.

A fixed 25 ft spacing ignores the actual temperature swing; fittings are chosen from the calculated movement.

Q19 · Installation · 38%

Modules are clamped to a rail system listed to UL 2703 for bonding, and the clamps are installed and torqued as its instructions say. What more is needed to bond each module?

Skip ahead to the key and the reasoning

A lug and copper on every frame duplicate a bond the listing already provides; they are not required.

With a UL 2703 bonding listing, the clamps installed and torqued as instructed are the bond (110.3(B)); no extra hardware is required.

A washer the instructions do not call for falls outside the listing and can spoil the tested clamp contact.

Frame-to-rail jumpers repeat the bond the listed clamps make; the listing does not ask for them.

Q20 · Installation · 38%

On a roof-mounted array, an installer asks whether an auxiliary grounding electrode must be driven at the array. Under 690.47 of the 2017 NEC, such an electrode is:

Skip ahead to the key and the reasoning

A mandatory array electrode dates from the 2014 edition; the 2017 edition made it a permission.

System voltage does not trigger an electrode requirement in 690.47.

690.47(B) in the 2017 NEC permits supplementary electrodes at ground- and roof-mounted arrays under 250.52 and 250.54 but does not require them; the array bonds back through the EGC.

690.47 expressly allows a supplementary electrode near a roof-mounted array.

Q21 · Commissioning · 17%

During commissioning, the irradiance meter reads 820 W/m². The modules' STC Isc is 10.8 A, and temperature effects on current are negligible. What string short-circuit current should the technician expect?

Skip ahead to the key and the reasoning

Worked answer: A

STC rating Isc at 1,000 W/m² = 10.8 A
Irradiance ratio 820 W/m² ÷ 1,000 W/m² = 0.82
Expected string Isc 10.8 A × 0.82 = 8.86 A

Isc scales with irradiance: 10.8 A × 820/1,000 = 8.86 A.

10.80 A is the STC value at 1,000 W/m², not scaled to the measured 820 W/m².

11.07 A tacks on the NEC 125% factor, a design margin with no place in a field comparison.

13.17 A divides by 0.82 instead of multiplying, which raises the current at lower light.

Q22 · Commissioning · 17%

A string of 12 modules should read about 470 V open-circuit at the current cell temperature. It measures 431 V, while its neighbors read 468–472 V. Which cause fits best?

Skip ahead to the key and the reasoning

Soiling cuts current far more than voltage; Voc barely moves at commissioning light levels.

Reversed leads flip the sign of the reading, not its size.

Strings on the same roof share cell temperature, and an 8% voltage loss would take a rise of roughly 30 °C.

The 39 V shortfall is almost exactly one module's share (470 ÷ 12 ≈ 39 V), pointing to a module skipped in the wiring or one whose bypass diodes have all failed shorted.

Q23 · Commissioning · 17%

To compare a string's measured current with its expected value, where should the irradiance sensor be placed?

Skip ahead to the key and the reasoning

Plane-of-array irradiance is what the modules receive, so the sensor matches their tilt and azimuth.

Horizontal irradiance differs from what a tilted array receives, so the expected current would be off.

Pointing at the sun measures more light than a fixed array actually sees.

Latitude tilt facing south matches the array only by coincidence; the sensor follows the array's actual orientation.

Q24 · Commissioning · 17%

A thermal image of an operating array in steady sun shows one cell in a module about 20 °C hotter than those around it, while the rest of the module looks even. Which explanation fits this pattern best?

Skip ahead to the key and the reasoning

A conducting bypass diode warms a whole substring and its junction box, not one isolated cell.

A cracked, defective, or locally shaded cell that cannot carry the string current is driven into reverse bias and turns power into heat, a hot spot confined to that cell.

A lead connector sits outside the laminate, so it cannot single out one cell inside it.

Air temperature warms a module evenly; it cannot make one cell 20 °C hotter than the cells beside it.

Q25 · O&M · 13%

An inverter logs an isolation (ground) fault most mornings after heavy dew, and the fault clears by late morning. How should the technician follow up?

Skip ahead to the key and the reasoning

Raising the threshold hides a real leakage path and leaves a shock and fire hazard in place.

The inverter is reporting a fault in the array wiring; a new inverter would trip the same way.

A fault that comes with moisture and clears as the array dries points to damaged insulation or a wet junction box; per-string insulation tests find which circuit leaks.

Dew on the glass is not the leak; the current path runs through damaged insulation or wet connections.

Q26 · O&M · 13%

A home's inverter trips on ac overvoltage on sunny afternoons, but utility voltage at the meter stays within limits. The inverter is 160 ft from the service panel. What explains the trips?

Skip ahead to the key and the reasoning

Excess dc power is clipped by the inverter; it does not raise the ac voltage.

Cold raises dc voltage on winter mornings, not on sunny afternoons, and it would show as a dc fault.

Utility voltage is normal, so anti-islanding has no outage to detect.

An exporting inverter must sit above service voltage; a long, small output circuit adds several volts and pushes the inverter's terminals past its trip setting.

Q27 · O&M · 13%

A 7.6 kW inverter's output flattens at about 6.1 kW on hot afternoons, and its heat-sink temperature reads high. On mild, clear days it reaches 7.6 kW. What accounts for the lower output?

Skip ahead to the key and the reasoning

A hot heat sink and a cap below nameplate only in hot weather mean the inverter is protecting itself; clogged filters or blocked airflow are the usual causes.

Clipping would cap output at 7.6 kW, the ac rating, not at 6.1 kW.

Degradation would cut output on cool days too, yet the inverter reaches 7.6 kW then.

A lost string lowers output all day, not only in hot afternoons, and does not heat the inverter.

Q28 · O&M · 13%

On a sunny day, a technician must pull a string fuse in a combiner to isolate that string for testing. Before opening the fuse holder, what must the technician do?

Skip ahead to the key and the reasoning

Speed does not make a non-load-break holder safe; a dc arc can sustain itself and damage the holder.

Fuse holders are not rated to break load current; with the inverter or load-break disconnect off and zero current confirmed, the holder can be opened without drawing an arc.

A voltage reading cannot show whether current is flowing through the holder.

PPE limits injury if an arc happens but does not make opening under load acceptable.

Q29 · Installation · 38%

A 10 AWG bare copper EGC runs along the racking at a rooftop array where foot traffic and tools could strike it. Under 690.46 of the 2017 NEC, what is required?

Skip ahead to the key and the reasoning

The EGC must survive to carry fault current; an exposed small conductor can be cut and leave frames unbonded.

Insulation is not physical protection; an insulated 10 AWG conductor still falls under 250.120(C).

690.46 sends EGCs smaller than 6 AWG to 250.120(C): where exposed to damage they need a raceway or cable armor, which a 6 AWG or larger conductor does not.

Bonding points do not protect the run between them from damage.

Q30 · Commissioning · 17%

In a fall-of-potential ground resistance test, the potential probe is placed at about what share of the distance from the electrode to the current probe?

Skip ahead to the key and the reasoning

10% sits inside the electrode's own resistance area, so the reading comes out far too low.

38% applies the 62% rule from the wrong end, measuring from the current probe instead of the electrode.

50% is a natural guess, but the curve's plateau sits farther out, near 62%.

For a single electrode, the reading at about 62% of the distance to the current probe equals the true resistance (the 62% rule).

0 / 30

Running score

Weighting that follows the installer JTA

Questions follow the job task analysis dated December 2017. Installation and System Design fill most of the set, and System Commissioning and Operations & Maintenance share the rest, matching their 17% and 13% of the exam. The line above each question names its domain, so after one run the misses show which part of the job analysis costs you the most points.

Code sections in the explanations use the numbering of the NEC 2017, the edition the exam is built on. If you learned on a later code, read the cited section in the 2017 edition, not in the one you learned on.

Working the numbers with exam-day tools

Calculation questions here take two or three steps: read the values from the stem, apply a correction or a code multiplier, then round to a standard size or compare the result with a limit. Each explanation lays those steps out in order.

On test day you work the math on the exam screen's own calculator, and the code is the electronic copy NABCEP provides, with your own code book allowed only under the conditions in the table below. Doing this set with a plain scientific calculator and an untabbed copy of the NEC 2017 keeps practice close to those conditions.

Parameter Figure As published Source
Calculator in the exam Only the basic scientific calculator built into the exam screen; no personal calculators [CBH] [FAQ]
Code edition on the exam NFPA 70, the National Electrical Code, 2017 edition. The NEC is the only reference allowed. An electronic copy is provided; candidates may also bring a softbound or spiral-bound code book of any year with highlighting only, no tabs or notes. [CBH] [FAQ]
Testing clock 4 h 4 hours [CBH]

From NABCEP's certification FAQ and the Certification Handbook (2025 update); checked November 22, 2026.

Wrong picks as a map of slips

Each of the four choices carries an explanation, the correct one included. On a calculation, every wrong figure comes from a particular slip, so the explanation under your pick names the step to redo. On a code question, the note names the section; open it and read the surrounding paragraphs, since related limits often sit in the next subsection.

When misses pile up in one domain, the matching section of the PVIP study guide lays out what that domain spans and the formulas behind its arithmetic.

Beyond this quiz: overview, domains, rules, costs

  • PVIP Who it is for, the three entry requirements, Board Eligible status, recertification
  • PVIP exam facts Question count, clock, scaled pass mark, the code on screen, results and retakes
  • PVIP registration Application, approval, booking with Meazure Learning and every fee in one place
  • PVIP study guide The four domains by weight, the code sections behind them and the core PV formulas

The PV Associate quiz, one level down

Mock-exam pacing with an NEC open

Can this quiz stand in for a timed PVIP mock exam?

Not on its own: it is shorter, 30 questions here against 70 on the board exam. To rehearse pacing, run it in one sitting and hold the per-question rate the full exam's clock implies.

Do I need a code book to work through these questions?

Not to answer them, but it helps to have one open. Looking up each cited section as you go is the same skill the exam tests with its electronic copy of the code, and it is faster to build on a short set than on test day.

What the bracketed tags point to