NABCEP PV Associate · study guide · built on job task analysis version 2026.2
A NABCEP study guide for the PV Associate starts from the job task analysis NABCEP put into use on April 7, 2026: six domains, two of them new, each with its share of the scored questions. This page takes the domains in NABCEP's order, lists the tasks inside each one, works through the arithmetic the outline calls for and adds two practice questions per domain.
20%each for Safety and Core Knowledge, the largest domains
April 7, 2026start of the current outline[PROG][JTA]
12practice questions on this page
How the scored questions divide
Each bar is a domain's share of the scored questions. NABCEP publishes the percentages but not a count per domain; the item numbers in the section headings below are our estimate from those shares, rounded to whole questions out of the scored total.
PV Associate job task analysis, version 2026.2: each domain's slice of the scored questions.
Job Task Analysis v.2026.2, in use on the exam since April 7, 2026. Item counts are rounded from those weights. [PROG][JTA]
What moved in the 2026 revision
The 2017 outline had five domains and no separate safety domain. The 2026 revision split out Safety and Core Knowledge, dropped the old PV Application domain and cut the shares of Design and Installation the most. Both the 2017 and the 2026 weights are listed in the table that follows.
Parameter
Figure
As published
Source
Job task analysis in use
Job Task Analysis v.2026.2, in use on the exam since April 7, 2026
2017 analysis, five domains: PV Application 15%, Sales & Economics 13%, Design 25%, Installation 29%, Operations & Maintenance 18%.Safety and Core Knowledge became domains of their own in 2026; of the domains that carried over, Design and Installation lost the most weight. Handbook v.2.3.5 still lists the 2017 domains.
NABCEP’s 2026 reference list names both the 2017 and the 2023 editions of NFPA 70 (the NEC), OSHA’s construction rules in 29 CFR 1926, and textbooks on PV design and installation
From the PV Associate job task analysis, version 2026.2 (posted April 2026), the September 13, 2017 analysis, NABCEP's Associate Program page and its "PVA Updated Exam References (2026)" posted May 19, 2026; checked November 22, 2026.
Safety: 20%, about 12 scored items
This domain asks whether you can keep a crew unhurt on a solar job, and it is new as a domain in 2026. The job task analysis groups it under five headings:
recognizing hazards and choosing controls, from falls and weather to hazardous materials, digging and personal protective equipment;
safe habits with tools, lifting and vehicles;
what a site safety plan and an emergency plan contain;
electrical hazards: shock, arc flash, de-energizing and lockout/tagout, battery handling;
work at height, including harnesses, guardrails, hoisting and ladders.
The first heading opens with the hierarchy of controls, five levels that run from removing the hazard altogether down to personal protective equipment, which comes last. OSHA's construction standards (29 CFR 1926), one of the documents in the reading-list row above, are the place to check any distance or height you are unsure of.
The safety plan covers people who are not on the crew
Task 3 of this domain reaches past the installers. A site plan also decides who can walk into the work area, by fencing or screening it off; what has to be kept on site, such as the injury and illness prevention program and safety data sheets; and how the crew responds to an emergency, fall rescue included. A homeowner's children in the yard below a roof edge are a site-plan question, not a PPE one.
Core Knowledge: 20%, about 12 scored items
Core Knowledge, also new as a domain in 2026, is the electrical and equipment language that every other domain takes for granted. It has four parts.
System types: PV-direct, stand-alone, grid-tied and multimode systems with storage, and what each can and cannot do.
Applications and features: energy security and resilience, predictable electricity costs, environmental and economic benefits, distributed generation.
Components: modules, racking, string inverters, microinverters and other module-level electronics, rapid-shutdown equipment, batteries, load control, monitoring and the balance of system.
Electrical basics: the photovoltaic effect, Ohm's law, power against energy, AC and DC, single-phase, split-phase and three-phase service, series and parallel circuits, grounding and bonding.
Most of the arithmetic in this domain comes down to two relationships, Ohm's law and power as voltage times current, applied to data sheet values.
Worked example: a module's rated power from its data sheet values.
Voltage at maximum power (Vmp)
41.0 V
Current at maximum power (Imp)
9.76 A
Power = Vmp × Imp
41.0 V × 9.76 A
=
≈ 400 W
Illustrative values, not taken from a specific product; the product matches the module's nameplate rating at standard test conditions.
Sales & Economics: 10%, about 6 scored items
The smallest domain, down from 13% in 2017, covers the first conversation with a customer and the money questions behind a project. Expect tasks on:
qualifying a customer from the utility bill and what the site offers;
a preliminary estimate built from the household's usage pattern and its rate structure, including net metering, time-of-use rates and demand charges;
what moves the economics: equipment price, incentives, financing costs, warranties and module degradation;
the four ways to pay for a system, cash, lease, power purchase agreement and loan, along with service contracts and equipment replacement over the system's life.
Incentive programs differ by state and utility and are rewritten often, so learn how each kind of incentive affects the numbers rather than any one program's current terms.
Design: 18.3%, about 11 scored items
Design runs from the data sheet to the plan set, with a smaller share than the 25% in 2017 it had before. The tasks NABCEP lists:
reading module and inverter specifications, including the ratings at standard test conditions, open-circuit voltage and short-circuit current, and the listings behind the equipment;
knowing which electrical, building and fire codes apply, and that the local authority having jurisdiction and the utility have the last word;
the site factors that cut output: weather, soiling and shading;
sizing with derates and losses, string configuration and the DC-to-AC ratio, and the modeling tools that estimate energy production;
the parts of a plan set: site plan, line diagrams, conductor ratings and symbols;
structural loads from wind, snow and earthquakes, and how mounting and roofing carry them.
Structural questions at this level are about the kinds of load and where they act, plus simple arithmetic like the example below.
Worked example: the dead load an array adds to a roof, spread over the area it covers.
Module weight
20 modules × 48 lb
=
960 lb
Add racking and attachments
960 lb + 240 lb
=
1,200 lb
Array footprint
20 modules × 21.0 ft2
=
420 ft2
Distributed dead load
1,200 lb ÷ 420 ft2
=
≈ 2.9 lb/ft2
Illustrative values. The point load at each attachment is a separate check, and the roof's capacity is for the designer and the building department to confirm.
Installation: 18.3%, about 11 scored items
Installation lost more weight than any domain that carried over (29% in 2017) and now follows the job from the roof to the handover in four task groups.
Mounting structures: pitched, flat and ground mounts, fasteners and metal compatibility, and the grounding methods built into racking.
Electrical equipment, installed to the manufacturer's instructions: terminal torque, enclosure ratings, working clearances, fittings, labels, connectors and cable bend radius.
Energy storage: where lithium-ion and lead-acid batteries can go, what their manuals require and how they are labeled.
Commissioning: checklists and quality control, thermal imaging, polarity and string voltage checks, the steps before the system runs, and the owner's orientation.
The manufacturer's installation instructions run through all four groups; the job task analysis keeps returning to them for torque, clearances and connectors.
Operations & Maintenance: 13.3%, about 8 scored items
The last domain (18% in 2017) is about a system that is already running. Its five task groups are test equipment and how to use it safely, the performance values a healthy system should show, monitoring platforms and what they record, tracing why output falls short of the estimate, and routine maintenance over the life of the array.
Much of it rests on Core Knowledge: reading a meter, the effect of temperature and irradiance on module output and the parts of an inverter all come back here as troubleshooting.
Check yourself: two questions per domain
Score: 0 of 0 picked correctly · 12 items here
Q1 · Safety · 20%
A crew needs to stage 24 modules on a sloped residential roof before mounting them. Which staging plan best protects the roof structure?
One tap per item counts toward the score; opening the key first leaves the item unscored.
Skip ahead to the key and the reasoning
Small stacks spread over several framing members, close to where the rafters are supported, keep each concentrated load low and away from midspan.
One large pile concentrates the full weight at midspan, where a rafter bends the most under load.
The eave overhang is often the least supported part of the framing, and material at the edge can slide onto people below.
Decking between rafters is the weakest point of the roof surface; a full pallet there can crack or break through the sheathing.
Q2 · Core knowledge · 20%
A ranch pumps stock water with an array wired straight to a DC pump, with no battery in the system. What limits this PV-direct setup?
Skip ahead to the key and the reasoning
A DC pump runs directly from the array's DC output; an inverter is needed only for AC loads.
Early-morning sun is weak, so the pump starts slowly and flow stays low until the light builds.
The system never connects to the utility, so no interconnection agreement applies.
With no storage, the pump has power only while the array produces, so it slows in weak light and stops at night; a tank stores water instead of energy.
Q3 · Sales & economics · 10%
A 400-W module is expected to lose 0.5% of its rated power each year. Using that linear rate, about how much power should it produce at STC after 10 years?
Skip ahead to the key and the reasoning
Worked answer: B
Total loss after 10 years
10 × 0.5%
=
5%
Remaining power
400 W × (1 − 0.05)
=
380 W
Expected output after 10 years
380 W
360 W uses a 1% yearly loss, twice the stated rate.
Ten years at 0.5% a year is a 5% loss, and 400 W × 0.95 = 380 W.
395 W subtracts 0.5 W a year instead of 0.5% of the 400-W rating.
398 W applies the 0.5% loss a single time rather than in each of the 10 years.
Q4 · Sales & economics · 10%
A small business pays a large monthly demand charge based on its highest 15-minute load. Why might a PV array alone reduce that charge only slightly?
Skip ahead to the key and the reasoning
PV output serves the building's load and lowers metered demand while it produces; it never raises that demand.
Demand charges are based on power drawn from the grid, not on exports.
Demand is set by the single highest interval, so a passing cloud or a peak after sunset can leave the monthly maximum almost unchanged.
Net metering credits exported energy; it does not cancel production or change how peak demand is measured.
Q5 · Design · 18.3%
A solar resource map lists 5.2 peak sun hours per day for a site. What does that figure mean?
Skip ahead to the key and the reasoning
Clear-sky time is a weather measure; peak sun hours count energy, including what arrives through haze and light cloud.
Daylight lasts far longer than 5.2 hours, but early and late sun is weak, so day length overstates the energy.
Sun altitude affects intensity, but peak sun hours are an energy total, not time above a fixed angle.
Peak sun hours express a day's insolation as the number of hours at the 1,000 W/m² reference level, here 5.2 kWh/m² per day.
Q6 · Installation · 18.3%
During the final walkthrough with a new system owner, which topic should the installer make sure to cover?
Skip ahead to the key and the reasoning
An owner orientation covers the emergency shutdown steps, including where the disconnects or rapid shutdown initiator are and how to use them.
Opening the inverter exposes live parts and is service work for qualified people, not an owner task.
Changing string wiring is electrical work that needs a qualified installer and may require a permit.
Sending an owner onto a roof creates a fall hazard; cleaning, if needed, belongs in the maintenance plan.
Q7 · O&M · 13.3%
An inverter repeatedly shuts down and logs a DC arc-fault event, always on the same string. Which cause fits best?
Skip ahead to the key and the reasoning
Clouds change the string's current smoothly; they do not create the arcing signature the detector looks for.
Out-of-range grid voltage is logged as a grid fault on the AC side, not as a DC arc fault on one string.
A loose or damaged connection can arc intermittently, and the arc-fault detector trips on that signature, repeatedly on the same circuit.
A failed fan leads to temperature derating or an over-temperature fault, not a DC arc-fault event on one string.
Q8 · O&M · 13.3%
A system produced 3% less this June than last June. Weather data shows plane-of-array irradiance was also 3% lower this June. What does this suggest?
Skip ahead to the key and the reasoning
Degradation would show up as less output per unit of sunlight; here that ratio did not change.
When output falls by the same share as the available sunlight, energy per unit of sunlight is unchanged, so performance is normal.
An inverter losing efficiency would cut output by more than the irradiance drop explains.
Soiling would also lower output relative to irradiance, which the matching 3% figures rule out.
Q9 · Safety · 20%
A technician is taking a grid-tied string inverter out of service for repair. In which order should the disconnects be opened?
Skip ahead to the key and the reasoning
Opening the DC switch first makes it interrupt the string's full operating current, which is when a DC arc is most likely.
Working two handles at once puts both hands near energized equipment and gives no control over which side breaks the current.
With the AC side still closed, the inverter's output circuits stay energized from the utility during the repair.
Opening the AC side first stops the inverter, so the DC current drops before the DC switch is opened and the DC disconnect does not have to break the full operating current.
Q10 · Core knowledge · 20%
What sets a system with DC power optimizers apart from a system with microinverters?
Skip ahead to the key and the reasoning
Optimizers adjust each module's DC operating point, but a string inverter still does the DC-to-AC conversion; microinverters convert at each module.
Module-level AC output is how microinverters work; optimizer systems keep the roof circuits DC.
Optimizers have no storage; they only adjust each module's operating point.
Optimizer systems are often used to meet rapid shutdown; using them does not exempt the array from the rules.
Q11 · Design · 18.3%
A designer wants the most annual energy from a fixed, south-facing array in the continental US with no shading. Which tilt is the usual starting point?
Skip ahead to the key and the reasoning
A flat array suits low latitudes or racking limits, but in the continental US it collects less than a latitude tilt and sheds dirt and snow poorly.
A vertical array favors the low winter sun and loses much of the summer energy.
Tilting a fixed array near the site's latitude points it roughly at the sun's average yearly path, so it is the common starting point for annual energy.
Half the latitude tips the array toward the high summer sun and gives up winter energy, so it is not the usual starting point for yearly output.
Q12 · Installation · 18.3%
A homeowner asks why the installer proposes a lithium-ion battery rather than flooded lead-acid for a garage installation. Which advantage is accurate?
Skip ahead to the key and the reasoning
Lithium-ion systems depend on a battery management system to keep every cell within its voltage and temperature limits.
Lithium-ion modules are sealed, with no electrolyte for anyone to check or refill, unlike flooded lead-acid cells that lose water as they gas.
Lithium-ion capacity drops in the cold, and makers limit or block charging below freezing.
Different chemistries are not mixed in one bank, because each needs its own charging profile and would be mismanaged.
Start with job task analysis version 2026.2, which sets the domains and tasks. For content, use the documents in the reading-list row of the table near the top of this page. No code book may come into the exam room, so concentrate on rules worded alike in the 2017 and 2023 codes, and note where your own jurisdiction's adopted edition differs.
Is a training course required for the PV Associate?
Only on the education route. A candidate with 6 months full-time equivalent, at least 910 hours, in PV-related work can apply without a course, and so can a holder of an old Entry Level award. NABCEP sets no minimum course length.